Beverage End-of-Line Palletizing for a Bottling Plant
750
Cases per hour per line
-8
Operators redeployed
Case Studies
Output figures below come from commissioning records at the customer site. Customer names are anonymised where publishing permission was not granted.
Filter by industry
Filter by product line
Showing 6 of 6 projects

750
Cases per hour per line
-8
Operators redeployed

420
Picks per minute total
-60%
Product breakage rate

60+
SKU recipes stored
<2 min
Changeover time

14 s
Cycle time per part
+35%
Output increase

240
Blister packs per minute
ISO 8
Cleanroom class maintained

550
Cases per hour
300+
Pallet patterns generated
Customer Feedback
Quotes are published with permission. Where permission was not granted, the company is described by industry and region.
The simulation matched the real cycle time closely, so there was no surprise during commissioning. Their engineer stayed on site until the line reached stable output.
Production Manager, a beverage manufacturer in Southeast Asia
Beverage End-of-Line Palletizing for a Bottling Plant · Vietnam
Our operators learned to adjust the program by dragging the arm. That made the changeover between part numbers much easier than expected.
Plant Engineer, an automotive parts supplier in South America
Cobot Assembly Cell for Automotive Bracket Parts · Brazil